COUNTY ROAD J over EAST CARRIZO CREEK
0.1 MI E OF CR 3.5 · County 009, Colorado · Built 1973 · 2 Lanes · 29 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.091847, -103.025556
This bridge is in worse condition than 57.1% of bridges in County 009. The average bridge in Colorado is 0 years old; this one is 53 years old.
Bridge Details
- Structure #
- BAG-3.5-6-51
- Year Built
- 1973
- Length
- 18.4 m (60.4 ft)
- Max Span
- 16.4 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 29
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.