COUNTY ROAD Y over NORTH FORK SAND ARROYO
.8 MI W OF CR 6 · County 009, Colorado · Built 1960 · 2 Lanes · 1 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
37.308111, -102.989917
This bridge is in worse condition than 57.1% of bridges in County 009. The average bridge in Colorado is 0 years old; this one is 66 years old.
Nearby Bridges
US 160 ML over N FK SAND ARROYO
Built 2013
COUNTY ROAD 2 over TRIB N.FK SAND ARROYO
Built 1960
COUNTY ROAD U over SOUTH FORK SAND ARROYO
Built 1960
COUNTY ROAD CC over SOLDIER CREEK
Built 1938
US 160 ML over DRAW
Built 2013
COUNTY ROAD U over NORTH FORK SAND ARROYO
Built 1960
US 160 ML over DRAW
Built 1995
COUNTY ROAD 8 over SOUTH FORK SAND ARROYO
Built 1935
COUNTY ROAD 13 over TRIB N.FK LONE ROCK CRK
Built 1960
COUNTY ROAD 13 over TRIB N.FK LONE ROCK CRK
Built 1997
Bridge Details
- Structure #
- BA-Y-5.2-21-37
- Year Built
- 1960
- Length
- 12.2 m (40 ft)
- Max Span
- 11.3 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 1
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $95,000
- Total Project Cost
- $104,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.