US 6 ML EBND over STERLING CANAL NO 1
4.7 MI NE OF JCT SH 63 · County 075, Colorado · Built 1941 · 2 Lanes · 2,150 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
40.601164, -103.222339
This bridge is in worse condition than 92.9% of bridges in County 075. The average bridge in Colorado is 0 years old; this one is 85 years old.
Nearby Bridges
US 6 ML WBND over STERLING CANAL NO 1
Built 1961
County Road 24 over Sterling Ditch No 1
Built 1989
SH 14 ML over NORTH STERLING CANAL
Built 1947
I 76 ML EBND over FARM ROAD
Built 2003
I 76 ML WBND over FARM ROAD
Built 2003
Platte Street over Pioneer Drainage Ditch
Built 1995
US 6 ML over CITY STREETS UP RR
Built 1972
County Road 35 over Springdale Ditch
Built 1993
Platte Street over Sterling Ditch No. 1
Built 2003
County Road 35 over Pawnee Ditch
Built 1992
Bridge Details
- Structure #
- B-24-A
- Year Built
- 1941
- Length
- 9.7 m (31.8 ft)
- Max Span
- 8.2 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,150
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.