I 76 ML WBND over SH 63 ML

ATWOOD EXIT (HWY 63) · County 075, Colorado · Built 2003 · 2 Lanes · 4,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B-23-BB
Year Built
2003
Length
34.6 m (113.5 ft)
Max Span
33.5 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
4,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.