I25 ML SBND over POUDRE RIVER FLOODPLAIN
0.2 MI S OF KECHTER RD · County 069, Colorado · Built 2023 · 3 Lanes · 90,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.505106, -104.991603
This bridge is in worse condition than 29.9% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 3 years old.
Nearby Bridges
I25 ML NBND over POUDRE RIVER FLOODPLAIN
Built 2022
KECHTER RD over I 25 ML
Built 2022
Kechter Road over Fossil Creek Res. Inlet
Built 1988
County Road 5 over Fossil Cr Resv Outlet
Built 2013
Strauss Cabin Road over Fossil Creek Res. Inlet
Built 2005
Kechter Road over McClellands Channel
Built 2002
Lady Moon Drive over McClellands Channel
Built 2003
County Road 5 over Cache La Poudre River
Built 1997
HARMONY RD/OLDSH68 over I 25 ML
Built 1999
County Road 38 over Cache La Poudre River
Built 2010
Bridge Details
- Structure #
- B-17-EC
- Year Built
- 2023
- Length
- 62.8 m (206 ft)
- Max Span
- 20.1 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 3
- Daily Traffic
- 90,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.