SH 1 ML over I 25 ML
I-25 WELLINGTON INTER. · County 069, Colorado · Built 1966 · 2 Lanes · 9,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.703925, -104.997297
This bridge is in worse condition than 85.9% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 60 years old.
Nearby Bridges
I25 ML+FRONTAGE RD over WINDSOR RES CANAL
Built 1989
County Road 64 over Poudre Valley Canal
Built 1968
SH 1 ML over BOX ELDER CREEK
Built 1968
Jefferson Ave. over Boxelder Creek
Built 2005
Ronald Reagan Ave. over Local Drainage
Built 2005
Ronald Reagan Ave. over Boxelder Creek
Built 2005
Mount Owens Street over Local Drainage
Built 2005
Third Street over Boxelder Creek
Built 2005
County Road 64 over Poudre Valley Canal
Built 2003
I 25 ML+SERVICE RD over BOX ELDER CREEK
Built 1989
Bridge Details
- Structure #
- B-16-FN
- Year Built
- 1966
- Length
- 72.6 m (238.2 ft)
- Max Span
- 24 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 9,300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.