COUNTY ROAD 58 over I 25 ML and FRONTAGE RD
2.5 MI S OF SH 1 · County 069, Colorado · Built 1966 · 2 Lanes · 2,144 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.667942, -105.00055
This bridge is in worse condition than 61.7% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 60 years old.
Nearby Bridges
I 25 SERVICE RD over LARIMER COUNTY CANAL SR
Built 1966
I 25 ML SBND over LARIMER COUNTY CANAL
Built 1966
I 25 FRONTAGE RD over LARIMER COUNTY CANAL SR
Built 1966
I 25 ML NBND over LARIMER COUNTY CANAL
Built 1950
County Road 60 over Boxelder Creek
Built 1988
I 25 ML+SERVICE RD over BOX ELDER CREEK
Built 1989
McClellan Road over Local Drainage
Built 2007
County Road 9 over Larimer County Canal
Built 2018
Third Street over Boxelder Creek
Built 2005
Mount Owens Street over Local Drainage
Built 2005
Bridge Details
- Structure #
- B-16-FM
- Year Built
- 1966
- Length
- 82 m (269 ft)
- Max Span
- 22.7 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,144
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.