HUDSON ROAD over BOX ELDER CREEK

2 MI N OF 26TH AVENUE · County 001, Colorado · Built 1965 · 2 Lanes · 888 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

39.782522, -104.621606

This bridge is in worse condition than 79.4% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 61 years old.

Nearby Bridges

Bridge Details

Structure #
AUR98.1-AE.0
Year Built
1965
Reconstructed
2016
Length
18.6 m (61 ft)
Max Span
17.9 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
888
Material
Steel
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.