67TH PLACE over FARMERS HIGHLINE CANAL |

JUST E OF WESTWOODS CIR · County 059, Colorado · Built 1993 · 2 Lanes · 183 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
ARVA-67-0.01-01
Year Built
1993
Length
8.7 m (28.5 ft)
Max Span
8.3 m
Width
17 m (55.8 ft)
Lanes
2
Daily Traffic
183
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.