HARVARD AVE over HIGHLINE CANAL
0.3 MI. E. OF QUEBEC · County 005, Colorado · Built 1986 · 3 Lanes · 3,298 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.671211, -104.897317
This bridge is in worse condition than 49% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 40 years old.
Nearby Bridges
ILIFF AVENUE over CHERRY CREEK
Built 1981
YALE AVENUE over HIGHLINE CANAL
Built 1988
WABASH STREET over CHERRY CREEK
Built 2010
QUEBEC STREET over HIGHLINE CANAL
Built 1981
E YALE AVE over HIGHLINE CANAL
Built 1964
E YALE AVENUE over GOLDSMITH GULCH
Built 1995
E ILIFF AVENUE over GOLDSMITH GULCH
Built 1971
E YALE AVE over HIGHLINE CANAL
Built 1964
S YOSEMITE STREET over HIGHLINE CANAL
Built 1979
S MONACO ST PKWY over HIGHLINE CANAL
Built 1964
Bridge Details
- Structure #
- ARA 35A-7.3
- Year Built
- 1986
- Length
- 11.4 m (37.4 ft)
- Max Span
- 10.1 m
- Width
- 18.4 m (60.4 ft)
- Lanes
- 3
- Daily Traffic
- 3,298
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $151,000
- Total Project Cost
- $167,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.