COTTONWOOD DRIVE over NORTH MONUMENT CREEK
0.5 MI. FROM E. PINE LOOP · County 041, Colorado · Built 2014 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.965494, -104.855872
This bridge is in worse condition than 41.2% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 12 years old.
Nearby Bridges
WEST MONUMENT CREE over WEST MONUMENT CREEK
Built 1980
SOUTH GATE BLVD over MONUMENT CREEK AND UPRR
Built 1958
CARLSON DRIVE over DRY CREEK
Built 1986
EAST DOUGLASS VALL over DOUGLASS VALLEY TRIBUTAR
Built 1958
DAIRY RANCH RD over DRY CREEK
Built 1984
SOUTH GATE BLVD over KETTLE CREEK
Built 1958
STADIUM BLVD over DOUGLASS VALLEY TRIBUTAR
Built 1958
PEBBLE WAY over DRY CREEK
Built 1987
ALLEGHENY DRIVE over LOCAL DRAINAGE
Built 1984
STADIUM BLVD over LEHMAN RUN
Built 1958
Bridge Details
- Structure #
- AFCOXQPZ10631
- Year Built
- 2014
- Length
- 11.6 m (38.1 ft)
- Max Span
- 3.7 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete Continuous
- Design
- Frame (except frame culverts)
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $45,000
- Total Project Cost
- $68,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.