HARVEST ROAD over NERES CANAL

0.3 MILE N OF 152ND AVE · County 001, Colorado · Built 1990 · 2 Lanes · 889 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
ADA19N-154.4121
Year Built
1990
Length
16.8 m (55.1 ft)
Max Span
14.4 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
889
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.