120TH AVE EBND over RIVERDALE RD
2 MI W OF US85 · County 001, Colorado · Built 2005 · 2 Lanes · 9,443 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.914194, -104.89305
This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 21 years old.
Nearby Bridges
120TH AVE WBND over RIVERDALE RD
Built 2005
120TH AVE over BRANTNER DITCH
Built 2005
120TH AVE EBND over S. PLATTE RIVER
Built 2005
120TH AVE WBND over S. PLATTE RIVER
Built 2005
QUEBEC ST over BRANTNER GULCH
Built 2005
TAMARAC STREET over BRANTNER GULCH TRIB
Built 2005
VALENTIA ST over BRANTNER GULCH TRIB
Built 2006
BRIGHTON ROAD over FULTON DITCH
Built 2022
112TH AVENUE over FULTON DITCH
Built 2021
FAIRGROUNDS RD over BRANTNER GULCH
Built 1993
Bridge Details
- Structure #
- ADA120-07.9E305
- Year Built
- 2005
- Length
- 45.7 m (149.9 ft)
- Max Span
- 44.2 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 2
- Daily Traffic
- 9,443
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.