I 76 ML WBND over SH 59 ML

15 MI SW OF JCT US 385 · County 115, Colorado · Built 1968 · 2 Lanes · 4,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
A-26-O
Year Built
1968
Length
36.3 m (119.1 ft)
Max Span
11.6 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
4,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$175,000
Total Project Cost
$262,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.