IRR# COUNTY RD 213 over LA POSTA CANYON
5.9 MI NW OF SH 550 · County 067, Colorado · Built 1997 · 2 Lanes · 1,225 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 8 | Very Good |
Location
37.123194, -107.895733
This bridge is in worse condition than 51.4% of bridges in County 067. The average bridge in Colorado is 0 years old; this one is 29 years old.
Nearby Bridges
IRR# COUNTY RD 214 over ANIMAS RIVER
Built 1987
IRR# COUNTY RD 310 over FLORIDA RIVER
Built 1977
IRR# US 550 ML over ANIMAS RIVER
Built 1957
US 550 NBND over WILDLIFE CROSSING
Built 2022
US 550 SBND over WILDLIFE CROSSING
Built 2022
IRR# COUNTY RD 307 over FLORIDA RIVER
Built 1989
US 550 SBnd ML over DRAW
Built 1999
IRR# US 550 ML over DRAINAGE/GAME CROSSING
Built 1999
US 550 SBND ML over DRAW
Built 1999
US 550 SBND over WILDLIFE CROSSING
Built 2022
Bridge Details
- Structure #
- 067021305.9048A
- Year Built
- 1997
- Length
- 15.7 m (51.5 ft)
- Max Span
- 14.3 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,225
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.