FDR 648 over W FORK OF SAN JUAN RIVER
13.7 MI NNE OF PAGOSA SPG · County 079, Colorado · Built 1954 · 1 Lanes · 32 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
37.449883, -106.911136
This bridge is in worse condition than 30.8% of bridges in County 079. The average bridge in Colorado is 0 years old; this one is 72 years old.
Nearby Bridges
FDR 648 over WOLF CREEK
Built 1956
US 160 ML over HILLSIDE
Built 1981
US 160 ML over W FORK SAN JUAN RIVER
Built 1986
FDR 667 over EAST FORK SAN JUAN RIVER
Built 1969
FDR 667 over EAST FORK SAN JUAN RIVER
Built 1969
US 160 ML over TURKEY CREEK
Built 1946
HAREBELL DR over SAN JUAN RIVER
Built 2012
US 160 ML over SAN JUAN RIVER
Built 1996
US 160 ML over PASS CREEK
Built 1987
Bridge Details
- Structure #
- 021306000001024
- Year Built
- 1954
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.1 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 32
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $128,000
- Total Project Cost
- $192,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.