FDR 514 over PLATEAU CREEK
21.4 MI ON FDR 514 · County 033, Colorado · Built 1978 · 2 Lanes · 12 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.680042, -108.468297
This bridge is in worse condition than 29.6% of bridges in County 033. The average bridge in Colorado is 0 years old; this one is 48 years old.
Bridge Details
- Structure #
- 021302000001162
- Year Built
- 1978
- Length
- 36.9 m (121.1 ft)
- Max Span
- 18.3 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 12
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $450,000
- Total Project Cost
- $675,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.