USFS RD 302 over QUAYLE CREEK

1-70 AT BAKERVILLE EXIT · County 019, Colorado · Built 2006 · 2 Lanes · 10 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021007000010851
Year Built
2006
Length
11.1 m (36.4 ft)
Max Span
10.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
10
Material
Prestressed Concrete
Design
Slab
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.