3316: MILL CK CAMP over Lake Fork Gunnison River

8 mi SW Lake San Cristoba · County 053, Colorado · Built 1967 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000L59270
Year Built
1967
Length
24.4 m (80.1 ft)
Max Span
16.4 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
50
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$22,000
Total Project Cost
$22,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.