WHITE ROAD over CUNNINHAM SLOUGH
40 W OF PIER 3 PK AREA · County 013, California · Built 1945 · 2 Lanes · 11 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.05635, -122.016
This bridge is in worse condition than 66.7% of bridges in County 013. The average bridge in California is 0 years old; this one is 81 years old.
Nearby Bridges
WHITE ROAD over BELLOMA SLOUGH
Built 1945
WHITE ROAD over CUNNINGHAM SLOUGH
Built 1968
KINNEY BLVD over COUNTY RD & RR
Built 1945
NICHOLS RD over UP RR BNSF RY & AMTRAK
Built 1991
NICHOLS RD over CONTRA COSTA CANAL
Built 1945
WATERFRONT RD over SLOUGH
Built 1945
DRIFTWOOD DRIVE over CONTRA COSTA CANAL
Built 1994
PORT CHICAGO HWY over MOUNT DIABLO CREEK
Built 1979
MOTA DRIVE over CONTRA COSTA CANAL
Built 1985
STATE ROUTE 4 WB over WILLOW PASS ROAD
Built 1975
Bridge Details
- Structure #
- DAPAMCCON000448
- Year Built
- 1945
- Length
- 39.2 m (128.6 ft)
- Max Span
- 3.6 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 11
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $65,000
- Total Project Cost
- $90,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.