PINE FLAT DAM over KINGS RIVER D/S OF DAM

27 MI EAST OF FRESNO · County 019, California · Built 1956 · 2 Lanes · 175 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
CEPSPKCA0000002
Year Built
1956
Length
58.5 m (191.9 ft)
Max Span
9.7 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
175
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$2,000,000
Total Project Cost
$2,020,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.