COUNTY RD 29 over CHOWCHILLA RIVER

13 MI E OF CHOWCHILLA · County 039, California · Built 1975 · 2 Lanes · 71 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
CEPSPKCA0000001
Year Built
1975
Length
40.9 m (134.2 ft)
Max Span
16.6 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
71
Material
Concrete Continuous
Design
Tee Beam
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.