EL RANCHO ROAD over UNION PACIFIC RAILROAD

10.1 MILES FROM MAIN GATE · County 083, California · Built 1961 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
AFCAXUMU01910
Year Built
1961
Length
48.5 m (159.1 ft)
Max Span
18.6 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
400
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Other
Last Inspected
N/A
Est. Improvement
$85,000
Total Project Cost
$128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.