SITE 1 NORTH ACCES over ANAVERDE CREEK

Site 1 North Entrance int · County 037, California · Built 1954 · 2 Lanes · 40 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
AF69TTQK0012012
Year Built
1954
Length
6.2 m (20.3 ft)
Max Span
2 m
Lanes
2
Daily Traffic
40
Material
Steel
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.