FORESTA ROAD over MERCED RIVER

MP 48.2 on Hwy ""140"" the · County 043, California · Built 1960 · 2 Lanes · 2,080 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
8800028P0000000
Year Built
1960
Length
58.5 m (191.9 ft)
Max Span
23.5 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
2,080
Material
Concrete Continuous
Design
Tee Beam
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.