EL PORTAL ROAD over EAST FORK CASCADE CREEK
5.1 miles east from El Po · County 043, California · Built 1985 · 2 Lanes · 2,080 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.723906, -119.711658
This bridge is in worse condition than 33% of bridges in County 043. The average bridge in California is 0 years old; this one is 41 years old.
Nearby Bridges
EL PORTAL ROAD over LOWER CASCADE CREEK OVER
Built 2000
EL PORTAL ROAD over WILDCAT CREEK
Built 1985
BIG OAK FLAT ROAD over CASCADE CREEK
Built 1939
BIG OAK FLAT ROAD over TAMARACK CREEK
Built 1939
BIG OAK FLAT ROAD over WILDCAT CREEK
Built 1939
VALLEY LOOP ROAD over MERCED RIVER
Built 1928
FORESTA ROAD over CRANE CREEK
Built 2013
FORESTA ROAD over CRANE CREEK
Built 1959
EL CAPITAN CROSSOV over MERCED RIVER
Built 1933
STATE ROUTE 140 over CRANE CREEK
Built 1957
Bridge Details
- Structure #
- 8800013P0000000
- Year Built
- 1985
- Length
- 42.7 m (140.1 ft)
- Max Span
- 16.8 m
- Width
- 12.1 m (39.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,080
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- National Park Service
- Last Inspected
- N/A
- Est. Improvement
- $66,000
- Total Project Cost
- $99,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.