WEST SIDE ROAD over SOUTH FORK KINGS RIVER

KINGS CANYON HWY. MP 28.8 · County 019, California · Built 2013 · 2 Lanes · 300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
8580006P0000000
Year Built
2013
Length
85.3 m (279.9 ft)
Max Span
33.5 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$25,000
Total Project Cost
$38,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.