BEAR GULCH ROAD over CHALONE CREEK
CA STATE ROUTE 25 TO CA S · County 069, California · Built 1999 · 2 Lanes · 75 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
36.486969, -121.169544
This bridge is in worse condition than 51.3% of bridges in County 069. The average bridge in California is 0 years old; this one is 27 years old.
Bridge Details
- Structure #
- 8450001P0000000
- Year Built
- 1999
- Length
- 37 m (121.4 ft)
- Max Span
- 17.7 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 75
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- National Park Service
- Last Inspected
- N/A
- Est. Improvement
- $15,000
- Total Project Cost
- $23,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.