RUEGGER RD over ALAMO RIVER
1.5 MI W/O SR 111 · County 025, California · Built 1967 · 2 Lanes · 590 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
33.101372, -115.540381
This bridge is in worse condition than 92.6% of bridges in County 025. The average bridge in California is 0 years old; this one is 59 years old.
Nearby Bridges
STATE ROUTE 111 over ALAMO RIVER
Built 1971
BRANDT RD over ALAMO RIVER
Built 1950
BRANDT RD over NEW RIVER
Built 2002
KALIN RD over NEW RIVER
Built 1940
EDDINS RD over ALAMO RIVER
Built 1990
KERSHAW RD over ALAMO RIVER
Built 1970
STATE ROUTE 111 over NEW RIVER
Built 1985
RUTHERFORD RD(S26) over NEW RIVER
Built 1977
GENTRY RD over VAIL CANAL
Built 1936
GENTRY RD over NEW RIVER
Built 1978
Bridge Details
- Structure #
- 58C0145
- Year Built
- 1967
- Length
- 30.5 m (100.1 ft)
- Max Span
- 8.5 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 590
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $297,000
- Total Project Cost
- $498,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.