EDGAR RD over THISTLE CANAL
0.55 MI W/O FORRESTER RD · County 025, California · Built 1974 · 2 Lanes · 80 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
32.889669, -115.630622
This bridge is in worse condition than 92.6% of bridges in County 025. The average bridge in California is 0 years old; this one is 52 years old.
Nearby Bridges
SWARTHOUT RD over WESTSIDE MAIN CANAL
Built 1950
FORRESTER RD (S30) over NEW RIVER
Built 1971
MUDD RD over WESTSIDE MAIN CANAL
Built 1950
KEYSTONE RD over WESTSIDE MAIN CANAL
Built 1950
HARRIS ROAD over CENTRAL MAIN CANAL
Built 1950
KEYSTONE RD over NEW RIVER
Built 1957
LARSEN ROAD over CENTRAL MAIN CANAL
Built 1950
FORRESTER RD (S30) over WESTSIDE MAIN CANAL
Built 1950
NECKEL ROAD over CENTRAL MAIN CANAL
Built 1972
URGUHART RD over WESTSIDE MAIN CANAL
Built 1950
Bridge Details
- Structure #
- 58C0133
- Year Built
- 1974
- Length
- 20.7 m (67.9 ft)
- Max Span
- 10.1 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 80
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $177,000
- Total Project Cost
- $297,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.