DREW RD over NEW RIVER

0.8 MI S/O I-8 · County 025, California · Built 1948 · 2 Lanes · 1,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
58C0026
Year Built
1948
Length
41.1 m (134.8 ft)
Max Span
7.6 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
1,500
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$892,000
Total Project Cost
$1,499,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.