INTERSTATE 8 over EAST COYOTE WASH

11-IMP-008-R18.88 · County 025, California · Built 1968 · 4 Lanes · 12,523 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
58 0345
Year Built
1968
Length
7.4 m (24.3 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
12,523
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.