STATE ROUTE 78 EB over NEW RIVER

11-IMP-078-R12.48 · County 025, California · Built 2012 · 2 Lanes · 6,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
58 0337R
Year Built
2012
Length
93.2 m (305.8 ft)
Max Span
35.1 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
6,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.