CHASE CREEK LANE over SAN DIEGO RIVER TRIBUTAR

100 FT W/O LAKESIDE AVE · County 073, California · Built 2004 · 2 Lanes · 100 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
57C0837
Year Built
2004
Length
6.6 m (21.7 ft)
Max Span
3 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
100
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.