COAST HIGHWAY over LOMA ALTA CREEK

0.3MI S/O OCEANSIDE BLVD · County 073, California · Built 2003 · 3 Lanes · 22,100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
57C0706
Year Built
2003
Length
17.5 m (57.4 ft)
Max Span
15.1 m
Width
24.4 m (80.1 ft)
Lanes
3
Daily Traffic
22,100
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$427,000
Total Project Cost
$717,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.