SOUTH MELROSE DR over AGUA HEDIONDA CREEK

0.5 MI S/O SHADOWRIDGE DR · County 073, California · Built 1990 · 3 Lanes · 15,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57C0704L
Year Built
1990
Length
85 m (278.9 ft)
Max Span
33.8 m
Width
15.8 m (51.8 ft)
Lanes
3
Daily Traffic
15,600
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.