J STREET over CENTRAL DRAINAGE

50 FT W/O RTE I-5 RAMPS · County 073, California · Built 1970 · 5 Lanes · 5,700 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
57C0659
Year Built
1970
Length
8.2 m (26.9 ft)
Max Span
2.4 m
Width
42.3 m (138.8 ft)
Lanes
5
Daily Traffic
5,700
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.