GRAND AVE over ROSE CANYON CREEK
0.4 MI W/O MISSION BAY DR · County 073, California · Built 1956 · 4 Lanes · 39,700 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
32.8019, -117.222108
This bridge is in worse condition than 97.8% of bridges in County 073. The average bridge in California is 0 years old; this one is 70 years old.
Nearby Bridges
GARNET AVE over ROSE CANYON CREEK
Built 1939
MISSION BAY DR over ROSE CANYON CREEK
Built 1930
INTERSTATE 5 over BALBOA AVE
Built 1954
INTERSTATE 5 over DAMON AVE
Built 1954
MORENA BLVD over BALBOA AVE
Built 1969
INTERSTATE 5 over DE ANZA OFF RAMP
Built 1969
MISSION BAY DR over ROUTE 5
Built 1966
INTERSTATE 5 over DE ANZA OFF-RAMP
Built 1954
INTERSTATE 5 over ROSE CANYON CREEK
Built 1954
SANTA FE STREET over ROSE CANYON CREEK
Built 1966
Bridge Details
- Structure #
- 57C0525
- Year Built
- 1956
- Length
- 47.5 m (155.8 ft)
- Max Span
- 15.5 m
- Width
- 29.6 m (97.1 ft)
- Lanes
- 4
- Daily Traffic
- 39,700
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,420,000
- Total Project Cost
- $2,385,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.