HOLLISTER ST over TIJUANA RIVER

1.6 MI S/O CORONADO AVE · County 073, California · Built 1953 · 2 Lanes · 1,279 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57C0430
Year Built
1953
Length
249.3 m (817.9 ft)
Max Span
5.8 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
1,279
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.