GARDEN RD over LOS PENASQUITOS CRK TRIB

0.65MI E/O POWAY RD · County 073, California · Built 1972 · 2 Lanes · 4,200 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
57C0364
Year Built
1972
Length
6.7 m (22 ft)
Max Span
3 m
Width
19.2 m (63 ft)
Lanes
2
Daily Traffic
4,200
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.