BEYER WAY over OTAY RIVER

0.42MI N/O PALM AVE · County 073, California · Built 1980 · 4 Lanes · 14,732 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57C0333
Year Built
1980
Length
137.2 m (450.1 ft)
Max Span
15.2 m
Width
25.8 m (84.6 ft)
Lanes
4
Daily Traffic
14,732
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.