WILLOW GLEN RD over RAINBOW CREEK

1.4MI N/O MISSION RD · County 073, California · Built 1984 · 2 Lanes · 329 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
57C0142
Year Built
1984
Length
25.9 m (85 ft)
Max Span
12.2 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
329
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.