MIRAMAR RD over MTDB BNSF RY & AMTRAK

1.2 MI E OF I-805 · County 073, California · Built 1975 · 8 Lanes · 60,580 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
57C0075
Year Built
1975
Reconstructed
1989
Length
31.4 m (103 ft)
Max Span
11 m
Width
37.5 m (123 ft)
Lanes
8
Daily Traffic
60,580
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.