MORENA BLVD over SAN DIEGO RVR FRIARS RD

JUST NORTH OF I-8 · County 073, California · Built 1952 · 4 Lanes · 40,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57C0028
Year Built
1952
Reconstructed
1969
Length
286.5 m (940 ft)
Max Span
24.7 m
Width
19.5 m (64 ft)
Lanes
4
Daily Traffic
40,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.