MAIN ST over CHOLLAS CREEK
0.12M S/O 32ND ST · County 073, California · Built 1937 · 4 Lanes · 18,545 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
32.691233, -117.123628
This bridge is in worse condition than 97.8% of bridges in County 073. The average bridge in California is 0 years old; this one is 89 years old.
Nearby Bridges
WABASH BLVD (SR15) over MAIN STREET
Built 1954
S15-MAIN ST OFFRMP over SOUTH BRANCH CHOLLAS CRK
Built 1953
MAIN-N15 ON RAMP over SOUTH BRANCH CHOLLAS CRK
Built 1954
N5-N15 CONNECTOR over I 15 NB NATIONAL CREEK
Built 1978
RIGEL STREET over S.BR. CHOLLAS CREEK
Built 2006
INTERSTATE 15 over S15-MAIN S BR CHOLLAS CR
Built 1954
S15-N5 CONNECTOR over CHOLLAS CREEK
Built 1963
INTERSTATE 5 over I 15 S15-MAIN OFF S5-N15
Built 1963
INTERSTATE 5 over CHOLLAS CREEK
Built 1963
INTERSTATE 5 over RIGEL STREET
Built 1963
Bridge Details
- Structure #
- 57C0020
- Year Built
- 1937
- Length
- 28 m (91.9 ft)
- Max Span
- 9.1 m
- Width
- 20.7 m (67.9 ft)
- Lanes
- 4
- Daily Traffic
- 18,545
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,336,000
- Total Project Cost
- $2,244,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.