TORREY MEADOWS DR over SR 56

11-SD-056-5.60-SD · County 073, California · Built 2020 · 2 Lanes · 1,440 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 1246
Year Built
2020
Length
102.7 m (336.9 ft)
Max Span
51.4 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
1,440
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.