E PALOMAR ST BUSWA over ROUTE 125
11-SD-125-2.64-CHV · County 073, California · Built 2019 · 1 Lanes · 1,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.626056, -116.973306
This bridge is in worse condition than 18.4% of bridges in County 073. The average bridge in California is 0 years old; this one is 7 years old.
Nearby Bridges
ROUTE 125 NB over OLYMPIC PARKWAY
Built 2007
ROUTE 125 SB over OLYMPIC PARKWAY
Built 2007
ROUTE 125 S over BIRCH ROAD
Built 2007
ROUTE 125 N over BIRCH ROAD
Built 2007
ROUTE 125 NB over BOB PLETCHER WAY
Built 2007
ROUTE 125 SB over BOB PLETCHER WAY
Built 2007
OTAY LAKES RD over TELEGRAPH CANYON CHANNEL
Built 1990
OLYMPIC PKWY over POGGI CANYON CHANNEL
Built 1999
SAINT CLAIRE DRIVE over TELEGRAPH CANYON CHANNEL
Built 1994
ROUTE 125 SB over OTAY LAKES ROAD
Built 2007
Bridge Details
- Structure #
- 57 1244
- Year Built
- 2019
- Length
- 226.8 m (744.1 ft)
- Max Span
- 42.7 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 1
- Daily Traffic
- 1,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.