STATE ROUTE 76 WB over SDCWA PIPELINES

11-SD-076-R16.33 · County 073, California · Built 2017 · 2 Lanes · 13,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
57 1235L
Year Built
2017
Length
45.1 m (148 ft)
Max Span
43.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
13,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.