EASTLAKE PARKWAY over ROUTE 125

11-SD-125-4.53 · County 073, California · Built 2007 · 2 Lanes · 23,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
57 1189
Year Built
2007
Length
79.3 m (260.2 ft)
Max Span
42.2 m
Width
20.5 m (67.3 ft)
Lanes
2
Daily Traffic
23,900
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.