ROUTE 905 EB over SPRING CANYON

11-SD-905-R7.38 · County 073, California · Built 2012 · 3 Lanes · 16,250 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 1155R
Year Built
2012
Length
51.2 m (168 ft)
Max Span
25.6 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
16,250
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.